Skip to content
Menu
Lotusland Fine Art's Blog
  • LLFA Main Site
  • Contact
Lotusland Fine Art's Blog
  • LinkedIn
  • Twitch
  • Patreon

Metro Center

Posted on 18 September 20154 September 2015
The Washington, DC Metro was ridiculously delayed that weekend due to construction. The silver line was running every 24 minutes. The red line was running every 15-20 minutes. It was frustrating and a perfect opportunity to make subway shots. 1 August 2015.
The Washington, DC Metro was ridiculously delayed that weekend due to construction. The silver line was running every 24 minutes. The red line was running every 15-20 minutes. It was frustrating and a perfect opportunity to make subway shots. 1 August 2015.

Share the Beauty:

  • Share on Bluesky (Opens in new window) Bluesky
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on WhatsApp (Opens in new window) WhatsApp
  • Email a link to a friend (Opens in new window) Email

Like this:

Like Loading…

Related

What I Just Saw

  • This Is Us: Quiet Ride 5 June 2026
  • 180th Street, The Bronx 1 May 2026
  • Busy Working 20 April 2026
  • Open Doors 21 February 2026
  • Waiting to Open 20 February 2026

Archives

©2026 Lotusland Fine Art's Blog | WordPress Theme by Superb WordPress Themes

Loading Comments...

    %d